EPA-W11062010-CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK-SOUTHWEST |
|
EPA-W10/052011- “CONSTRUCTION OF NATURAL GAS SUPPLY PIPES IN THE PREFECTURE OF ATTICA, CONTRACTUAL AREA SOUTHWEST” OF “EPA ATTICA S.A.” |
|
EPA-W07/052011-"SUPPORT WORKS OF THE MEDIUM AND LOW PRESSURE NATURAL GAS DISTRIBUTION AND DISTRIBUTION SYSTEM AND ITS INSTALLATIONS IN THE PREFECTURE OF ATTICA" |
|
EPA-W06/042012 "CONSTRUCTION OF SUPPLY PIPES AND MINOR EXTENSIONS OF LOW PRESSURE NETWORK 4 BAR IN THE PREFECTURE OF ATTICA CONTRACT AREA: NORTHEAST" |
|
EPA-00.070 "CONSTRUCTION OF SUPPLY PIPES AND MINOR EXTENSIONS OF LOW PRESSURE NETWORK UP TO 4 BAR IN THE PREFECTURE OF ATTICA CONTRACT AREA: NORTHEAST" |
|
EPA-03.012 "CONSTRUCTION OF A MEDIUM PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 19 BAR, LOW PRESSURE UP TO 4 BAR AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.085 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.088 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 KAI SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.095 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 KAI SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.096 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 KAI SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EPA-00.103 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR AND CONSTRUCTION OF SUPPLY PIPES IN THE COUNTY" |
|
CONSTRUCTION WORKS OF SUPPLY PIPES (SERVICE LINES) AND CONSTRUCTION OF SUPPLY COLUMNS (RISERS) IN THE PREFECTURE OF THESSALONIKI AND THE REGION OF THESSALY FOR THE YEAR 2019", PART 1 (CENTRAL-EASTERN THESSALONIKI)" |
|
CONSTRUCTION WORKS OF SUPPLY PIPES (SERVICE LINES) AND CONSTRUCTION OF SUPPLY COLUMNS (RISERS) IN THE PREFECTURE OF THESSALONIKI AND THE REGION OF THESSALIA FOR THE YEAR 2019”, PART 2 (CENTRAL-WESTERN THESSALONIKI) |
|
CONSTRUCTION WORKS OF SUPPLY PIPES (SERVICE LINES) AND CONSTRUCTION OF SUPPLY COLUMNS (RISERS) IN THE PREFECTURE OF THESSALONIKI AND THE REGION OF THESSALIA FOR THE YEAR 2019”, PART 3 (CENTRAL-EASTERN THESSALIA) |
|
EDA-00.124 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 KAI SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.131 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.137 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.104 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.110 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.115 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.119 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK WITH UP TO 4 SUPPLY PIPES IN THE PREFECTURE OF ATTICA" |
|
EDA-00.154 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA |
|
CONSTRUCTION WORKS OF UNDERGROUND SUPPLY PIPES (SERVICE LINES), INSTALLATION OF REGULATORY DEVICES, CONSTRUCTION OF AERIAL AND UNDERGROUND SUPPLY COLUMNS (RISERS), EXTENSION AND CONNECTION OF EXISTING SUPPLY COLUMNS (RAKOR), INSTALLATION OF METRIC DEVICES, IN THE PREFECTURE OF THESSALONIKI AND THE REGION OF THESSALIA FOR THE YEAR 2021, PART NO. 3 CENTRAL-EASTERN THESSALIA |
|
CONSTRUCTION WORKS OF UNDERGROUND SUPPLY PIPES (SERVICE LINES), INSTALLATION OF REGULATORY DEVICES, CONSTRUCTION OF AERIAL AND UNDERGROUND SUPPLY COLUMNS (RISERS), EXTENSION AND CONNECTION OF EXISTING SUPPLY COLUMNS (RAKOR), INSTALLATION OF METRIC DEVICES, IN THE PREFECTURE OF THESSALONIKI AND THE REGION OF THESSALIA FOR THE YEAR 2021, PART NO. 4 WESTERN THESSALIA |
|
EDA-00.158 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA |
|
|
EDA-00.136 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA
CONNECTION OF HOUSEHOLD AND COMMERCIAL CONSUMERS IN THE CITIES OF LAMIA AND CHALKIDA
EDA-00.147 "CONSTRUCTION OF A LOW PRESSURE NATURAL GAS DISTRIBUTION NETWORK UP TO 4 BAR, A MEDIUM PRESSURE STEEL NETWORK UP TO 19 BAR, AND SUPPLY PIPES IN THE PREFECTURE OF ATTICA
EXTENSION OF STEEL NETWORK (19BAR), POLYETHYLENE NETWORK AND CONNECTIONS OF RESIDENTIAL AND COMMERCIAL CUSTOMERS TO LOW PRESSURE NETWORKS (4BAR), IN THE CITIES OF CHALKIDA AND THEBIA, IN THE REGION OF STEREA GREECE
FRAMEWORK AGREEMENT FOR THE EXPANSION OF LOW-PRESSURE NETWORKS AND THE CONNECTION OF RESIDENTIAL AND COMMERCIAL CUSTOMERS IN THE CITIES OF CHALKIDA AND THEBA
|
|
|